When the last staff member leaves for the holiday break, the building does not stop working. The HVAC system shifts into setback mode, outdoor air ventilation drops, doors stay closed and nobody is walking the halls to notice a drip or a smell. For a few days that is fine. Over a two-week winter break, it changes how moisture and air behave inside the building.
Here is what facilities teams should set before the shutdown, what to check while the building is empty and what to look for when everyone comes back.
Why does a closed building behave differently?
An occupied building has people opening doors, running restrooms and kitchens, and an HVAC system moving air on a steady schedule. A closed building has much less air movement. Rooms with closed doors, storage areas and spaces behind furniture get little circulation. Any moisture source, such as a slow plumbing leak, a roof leak from snowmelt or a clogged condensate drain, has days to work without anyone seeing it.
The U.S. Environmental Protection Agency’s guidance for schools recognizes this. It notes that “with intermittent building occupancy over breaks, outdoor air ventilation rates may need to be adjusted,” and it encourages schools to “consider creating a holiday maintenance schedule.”
Should you shut the HVAC system off completely?
In most cases, no. Setbacks save energy, but a system that is fully off cannot manage humidity or keep air moving through the building. EPA recommends indoor relative humidity below 60 percent, ideally between 30 and 50 percent. A modest temperature setback with scheduled run times usually does a better job of holding that range than a full shutdown.
If your building uses energy recovery ventilators, EPA’s school guidance also advises facilities to “activate the frost control option on Energy Recovery Ventilation (ERVs) systems as appropriate” during cold weather.
What should you check before the building closes?
A short pre-break walk-through catches most problems before they start:
- Confirm setback schedules and run times are programmed, not just a single low set point
- Check that HVAC drip pans are clean and draining; EPA advises keeping them “clean, flowing properly and unobstructed”
- Make sure supply and return registers are open; EPA notes to “check that air registers are not inadvertently obstructed by furniture or large objects that may have been moved”
- Look for and fix any active plumbing or roof leaks; EPA advises fixing “leaky plumbing and leaks in the building envelope as soon as possible”
- Clear food, wet trash and damp materials such as mop heads and gym towels from classrooms, break rooms and storage areas
- Leave interior doors partly open where security allows, so air can circulate
What should you check during the break?
A midbreak check is the most valuable item on a holiday maintenance schedule. A walk-through every few days, or after any major snow or cold snap, can include:
- Mechanical rooms and rooftop units, for drips, standing water or alarms
- Ceilings under roof drains and along exterior walls, for new stains after snowmelt
- Restrooms and kitchens, for slow leaks under sinks
- Building automation readouts, for temperature and humidity in remote zones
EPA states plainly that “poorly maintained HVAC units can lead to IAQ problems, including mold issues,” and that “microbial growth in drip pans, ductwork, coils and humidifiers can both disrupt the HVAC system” and affect indoor air quality. A few minutes of checking during the break is far easier than a cleanup after it.
What should you look for when everyone comes back?
Before or on reopening day, return the HVAC system to its occupied schedule early enough to flush the building with outdoor air before people arrive. Then walk the building with fresh eyes:
- Musty odors in rooms that were closed up
- New water stains on ceiling tiles or walls
- Condensation on windows or cold exterior walls
- Damp carpet near entrances, exterior walls or plumbing
If you find something wet, EPA’s guidance is to “clean and dry wet or damp spots within 48 hours.” For active water or soaked materials, our sister company, Ram Restoration, handles water extraction and drying.
When does it make sense to bring in a professional?
Call for an assessment if you notice a musty smell that does not clear once ventilation is back to normal, staining that appeared during the break, or repeated complaints from occupants about a specific room. Ram Mold Pro inspects commercial buildings with moisture meters, thermal imaging and visual assessment to find where moisture is coming from and whether mold growth is present. EMT is one more tool we can use when it helps answer a specific question, but the first step is always finding the moisture.
EPA also offers a free Ventilation Checklist through its IAQ Tools for Schools program, which many facilities teams use to build a seasonal routine.
Why does this matter for Dayton-area buildings?
Many Miami Valley schools, offices and churches close for part of late December and early January, the same stretch when cold snaps and snowmelt are most likely. A building that sits closed through a freeze-thaw cycle with a setback thermostat and no one walking the halls is a building where small water problems go unnoticed. A simple schedule closes that gap.
Want a post-break walk-through of your facility? Call Ram Mold Pro: 888-609-6653 or www.rammoldpro.com
Dealing with water, fire or storm damage? Contact our sister company, Ram Restoration, at www.ramrestorationusa.com/contact/
Related reading
- Mold in the Workplace: What Dayton Employers and Property Managers Need to Know
- Why Do Holiday Decorations Smell Musty Coming Out of Storage?
- What Should You Actually Do As the Seasons Change, According to the EPA?
- All Ram Mold Pro articles
FAQ’s
What humidity should a building be kept at during a holiday shutdown?
30 to 50 percent: The ideal indoor relative humidity range recommended by EPA; keep it below 60 percent.
How quickly should wet materials be dried?
48 hours: EPA guidance for cleaning and drying wet or damp materials.
Should buildings have a holiday maintenance schedule?
1 schedule: EPA encourages schools to create a holiday maintenance schedule and adjust ventilation for breaks.
Sources: U.S. Environmental Protection Agency, “Healthy School Indoor Environments Winter E-Newsletter”; U.S. Environmental Protection Agency, “Mold Remediation in Schools and Commercial Buildings Guide: Chapter 2”


